News

29 September 2023 EasyMax journal: episode 14

In this episode, the aft ship of the ship is transported. Royal Niestern Sander director Fokke Jan Botke explains how this was done and invites you to the launch on October 19th. Wagenborg Crew Management director Cees Horvers explains how the crew for EasyMax 3 will be recruited. Stefan Bartlema from Esme Marine BV discusses all the aspects involved in the construction of the accommodation.

Read more

05 September 2023 EasyMax journal: episode 13

In this episode, the main engine is installed. Wagenborg Superintendent Udo Borger explains how this was done, and Nedlift Engineer Daan Rieks explains why this method was chosen. Chris van den Dool from mobile machining company De Wiel Services installed the propeller shaft and discusses all the aspects involved in the process.

Read more

31 July 2023 EasyMax journal: episode 12

In this episode: Images of our main engine during the Factory Acceptance Test at Wärtsilä's Smart Technology Hub in Finland. The deck hatches arrive in Farmsum by pontoon. Towage captain Jan Gerbers explains what this involves. And Nedlift crane operator Guido Egbertsen talks about the importance of teamwork when installing the deckhouse.

Read more

26 July 2023 25-year old MPP vessel ‘VECHTBORG’ ready for another 5 years of service after maintenance and updates

Recently, the mv Vechtborg has been taken into service again after her fifth special survey. During a period of maintenance, the 9.000 dwt V-type multipurpose vessel received a variety of maintenance works and updates on the hull, cargo holds, hatch covers, gantry crane, machinery and systems. These investments guarantee at least five more years of reliable shipping services for our customers.

Read more

30 June 2023 EasyMax journal: episode 11

In this episode, supervisor Dolf tells everything about the commissioning, Eekels project manager Bob highlights the bridge desk progress and Koert tells about his role as IT engineer.

Read more

05 June 2023 Construction EasyMax 4 started with cutting of first steel plates

Recently, the construction of the fourth EasyMax started with a steel cutting ceremony. This new multipurpose vessel was ordered recently at shipyard Royal Niestern Sander and is expected to be delivered and put into operation in 2024.

Read more

02 June 2023 EasyMax journal: episode 10

In this episode, Newbuilding Superintendent Udo Borger tells everything about the transport of the foreship. Self Propelled Modular Transporter-operator Victor Wierda explains how this works in practice. Bert Kuiken, Director Lending at ABN-AMRO gives an insight in how financing enables sustainability in the shipping industry with initiatives such as the EasyMax.

Read more

26 May 2023 Visit us at the Breakbulk Europe exhibition 2023

From June 6th until June 8th 2023 Breakbulk Europe 2023 will take place at Ahoy Rotterdam in the Netherlands. Breakbulk Europe 2023 is the largest exhibition & educational forum in Europe addressing the needs of traditional breakbulk and project cargo logistics professionals.

Read more

24 May 2023 First Transatlantic voyage sailing on biofuels reduces 68% GHG emissions

One of our F-class vessels recently completed Wagenborg’s first Transatlantic voyage sailing on co-processed marine fuel. This shipment – requested by one of our customers – illustrated the ease to switch to this type of a drop-in bio fuel, resulting in a 68% reduction of greenhouse gas emissions on this specific voyage.

Read more

Read more about our work in TIMES magazine

Times #23 (2024)

Download PDF version 

(File size: 5,64 MB)

 

Table of contents:

  • A conversation with Offshore director Edwin de Vries about the new KINGSBORG: “contract-based offshore is the future!”

  • 125 years of Wagenborg in pictures

download file

Times #22 (2023)

Download PDF version 

(File size: 4,11 MB)

 

Table of contents:

  • In conversation with Rob Wagenborg about growing up in a family business
  • Choices in the Wadden area: "Do you adapt the environment on ships or the other way around?"

download file

Times #21 (2022)

Download PDF version 

(File size: 6,10 MB)

 

Table of contents:

  • Why working at a family business is interesting!
  • “Working relationships between employer and employee are about love and loyalty.”

download file

Contact us

We are happy to help!

Contact