Length o.a.: 88.97 | Beam: 11.8
1 Hold / 1 Hatch. Fully open hatch - no understow. Fully box and double skinned (except narrowing fore/aft. part).
Cement Holes
Positions of cement holes in the following hatches on starboard side:
Hatch no 1 and 10 : 1,65 m of front hatch and 4,40 m of site hatch.
Positions of cement holes in the following hatches on port side:
Hatch no 4 and 8 : 1,65 m of front hatch and 4,40 m of site hatch.
Cement holes by dm
Outside 58 cm
inside 47 cm
Each hole: 12 bolts M24.
Length of bolt 13,5 cm.
Hold ventilation abt. 9 air changes per hour, basis empty hold. Hold is fitted with dehumidifier system.
MGO DMA 0,1% ISO 8217:2010. Within: ECA Area t/c operartion to be responsible for sulphur limit compliance