Length o.a.: 88.6 | Beam: 12.5
1 Hold/ 1 Hatch : both types are fully open hatch - no understow. Fully box and double skinned.
Cement Holes:
Positions of Cement holes in the following hatches on starboard:
hatch no. 1, 6 and 10 : 3,00 m of front hatch and 3,20 m of side hatch
Positions of Cement holes in the following hatches on port side:
Hatch no. 3 and 8 : 3.00 m of front hatch and 3,20 m of side hatch.
Cement holes by dm.
inside 46 cm
outside 56,5 cm
Each hole: 8 bolts M16, length of bolt 30mm
Hold ventilation abt.7 air changes per hour basis empty hold. Hold is fitted with dehumidifier system
MGO DMA 0,1% ISO 8217:2010. Within: ECA Area t/c operation to be responsible for sulphur limit compliance.