News

29 May 2019 Bothniaborg ready for service after 15 years renewal survey

The m.v. Bothniaborg was at the shipyard in Tallinn for her 15 year renewal survey. Thanks to a great team effort of the Wagenborg crew, technical office support and the shipyard, the RORO carrier is ready to serve again on her liner service for Smurfit Kappa

Read more

23 May 2019 Wagenborg supports mobilization WaveWalker in base port Eemshaven

The 8-legged walking jack-up WaveWalker was mobilized at the quay side in Eemshaven. Wagenborg played a major role in this mobilization since a variety of support services was required.

Read more

22 May 2019 Start construction next EasyMax

Recently, the construction of the second EasyMax has started at shipyard Royal Niestern Sander. This new multipurpose vessel was ordered recently and is expected to be delivered and put into operation next year.

Read more

13 May 2019 Topside Borssele Alpha to sea on Wagenborg Barge 7

Last week HSM Offshore has loaded out the Borssele Alpha substation topside onto the Wagenborg Barge 7 by means of self-propelled modular trailers (SPMTs) at its yard in Schiedam, the Netherlands.

Read more

08 May 2019 Taagborg loads yauchts at US East coast

Recently, the m.v. Taagborg loaded several yachts on deck in Port Everglades, Florida and Eastport Maine, USA.

Read more

02 May 2019 Visit us at the Breakbulk Europe exhibition 2019

From May 21st until May 23rd 2019 Breakbulk Europe 2019 will take place at the Messe Bremen in Germany. Breakbulk Europe 2019 is the largest exhibition & educational forum in Europe addressing the needs of traditional breakbulk and project cargo logistics professionals.

Read more

30 April 2019 ISO 9001 and ISO 14001 certification renewal Wagenborg Shipping

Wagenborg Shipping is pleased to announce her ISO 9001:2015 and ISO 14001:2015 have been renewed until 30th June of 2022. Wagenborg Shipping is audited and certified by Lloyd’s Register.

Read more

24 April 2019 m.v. Warnowborg added to fleet

Recently, Royal Wagenborg renamed the ‘NBP Carrier’ to ‘Warnowborg’. The vessel has been brought under Dutch Flag and Wagenborg’s management. The ‘Warnowborg’ is currently at a shipyard in Tallinn to be brought up to Wagenborg standards.

Read more

17 April 2019 Wagenborg successfully closes Geodis project after 44 voyages

Last week the m.v. Marietje Hester discharged bridge sections in Frederiksværk, Denmark. With this voyage, Wagenborg shipping in total 492 concrete segments in 44 voyages from Szczecin, Poland to Denmark and successfully closes the Geodis project.

Read more

Read more about our work in TIMES magazine

Times #23 (2024)

Download PDF version 

(File size: 5,64 MB)

 

Table of contents:

  • A conversation with Offshore director Edwin de Vries about the new KINGSBORG: “contract-based offshore is the future!”

  • 125 years of Wagenborg in pictures

download file

Times #22 (2023)

Download PDF version 

(File size: 4,11 MB)

 

Table of contents:

  • In conversation with Rob Wagenborg about growing up in a family business
  • Choices in the Wadden area: "Do you adapt the environment on ships or the other way around?"

download file

Times #21 (2022)

Download PDF version 

(File size: 6,10 MB)

 

Table of contents:

  • Why working at a family business is interesting!
  • “Working relationships between employer and employee are about love and loyalty.”

download file

Contact us

We are happy to help!

Contact