News

22 September 2020 Wagenborg tows a new port crane from Poland to Tata Steel in IJmuiden

Last weekend, Wagenborg delivered a new port crane to Tata Steel in IJmuiden under its own agency with the tugboats "Waterman" and "En Avant 30".

Read more

19 September 2020 Royal Wagenborg opts for sustainability with Hatenboer-Water bottle filling stations

After a successful test on six vessels, Royal Wagenborg is installing Hatenboer-Water bottle filling stations on another thirty vessels. The taps provide the crew with drinking water, making plastic bottles of water no longer necessary on board.

Read more

18 September 2020 Floating crane Triton closely involved in construction of Fryslân Wind Farm

Recently, the construction of Fryslân Wind Farm on the water started with the installation of the first of the 89 foundation piles into the bottom of the IJsselmeer. Wagenborg is closely involved in this important milestone with its floating crane ‘Triton’.

Read more

14 September 2020 Construction EasyMax 2 in progress with transport aft ship

At the Royal Niestern Sander shipyard, Wagenborg has transported the aft ship section of EasyMax 2 from the construction hall to the quay side. Yard number 851 for Royal Wagenborg and affiliated partners is the second vessel of the type Easymax.

Read more

31 August 2020 Construction EasyMax 2 in progress with installation of propeller shaft

At the Royal Niestern Sander shipyard, Wagenborg has installed the propeller shaft of the EasyMax 2. This vessel for Wagenborg and affiliated partners is the second vessel of the EasyMax type.

Read more

24 August 2020 Wagenborg mobile cranes support ship conversion

At shipyard Royal Niestern Sander, Wagenborg supported a conversion project of a container vessel to a gravel dredger by means of various mobile cranes. These mobile cranes installed large parts of the suction installation.

Read more

20 August 2020 MV Wislaborg demonstrates Wagenborg ambitions in West Africa

Wagenborg has shipped 8.500 tonnes of fertilizers from the European Continent to West Africa. The cargo was discharged from the MV Wislaborg in the port of Tema, Ghana. The MV Wislaborg is one of the geared W-class vessels in the Wagenborg fleet.

Read more

17 August 2020 Construction EasyMax 2 in progress with installation of main engine

At the Royal Niestern Sander shipyard, Wagenborg has installed the main engine of the EasyMax 2. This vessel for Wagenborg and affiliated partners is the second vessel of the EasyMax type.

Read more

10 August 2020 ASD tug Waterstraat tows cable reels to Eemshaven

Last weekend the 60tBP ASD tug Waterstraat towed the pontoon CC Atlantique from Rotterdam to Eemshaven. The pontoon was loaded with two cable reels.

Read more

Read more about our work in TIMES magazine

Times #23 (2024)

Download PDF version 

(File size: 5,64 MB)

 

Table of contents:

  • A conversation with Offshore director Edwin de Vries about the new KINGSBORG: “contract-based offshore is the future!”

  • 125 years of Wagenborg in pictures

download file

Times #22 (2023)

Download PDF version 

(File size: 4,11 MB)

 

Table of contents:

  • In conversation with Rob Wagenborg about growing up in a family business
  • Choices in the Wadden area: "Do you adapt the environment on ships or the other way around?"

download file

Times #21 (2022)

Download PDF version 

(File size: 6,10 MB)

 

Table of contents:

  • Why working at a family business is interesting!
  • “Working relationships between employer and employee are about love and loyalty.”

download file

Contact us

We are happy to help!

Contact