Wagenborg Terminal Eemshaven

  • ISPS 

  • AEO

  • ISO 9001 certified

  • ISO 14001 certified

Eemshaven in a nutshell

Storage areaCreated with Sketch.

160.000 storage area

10 t/m2 surface load

Draft of 14m

1.540m quay length

Wagenborg operates a high-performance multipurpose terminal at the Julianahaven en Emmahaven in Eemshaven. Its equipment and its location qualify the terminal for the handling of any kind of goods. The terminal has a storage area of ??160,000 square meters and a quay length of over 1.500 meters. Its modern facilities and privileged location make it a popular base port for offshore wind projects. Wagenborg terminal Eemshaven has already supported various offshore windfarms in the North Sea with port logistic services.

 

Wagenborg wants to contribute to a cleaner environment and less emissions on the quays in the port.
A good example is the realization of a shore power connection on our quay in Eemshaven. The electricity supplied for this connection is generated in a green manner, thereby reducing CO2 throughout the chain.

Port basin

  • Width of port basin: 300 mtr

  • Height of quay above N.A.P.: 4,4 mtr

  • Water depth at quay side: 12 mtr

  • Tidal range 2–3 mtr

  • Distance Jack-up Barge: min. 15 mtr from quayside for jacking up

  • Surface load at quay side 2,5 tons/sqm

  • Bollard pull 800 Kilo Newton (two bollards every 20 mtr)

Port access

  • Gate passage: unrestricted height

  • 500 mtr wide, no further barriers

  • Depth: 14 mtr at high water (NAP) incl. 10% UKC (UKC Under Keel Clearance)

  • No locks

Other

  • 2x 12 axle-lines SPMT + 2 PPU

  • Cherry Pickers (several heights)

  • Telescopic handler

  • Forklifts

  • Generators

  • RoRo ramp: width of 12 mtr, max. load of 90 tons, limited clearance

Handling portfolio Eemshaven

Onshore/Offshore wind

Project cargo and heavy-lift

Lading transportCreated with Sketch.

RoRo traffic

Bulk cargo

Latest News

Follow us on LinkedIn, just like more than 31.887 other shipping transport professionals.

20 December 2024 A retrospect on 2024

Welcome to a vibrant reflection on the incredible journey of Wagenborg in 2024! This past year was filled with remarkable achievements across all our business segments. Despite the ups and downs of the market, we thrived, delivering outstanding volumes and dependable logistics services to our valued customers. As we gear up for an exciting 2025, we carry forward this positive momentum. Join us as we celebrate some of the inspiring stories that shaped our success last year!

Read more

23 May 2024 Wagenborg contributes to building project new Hunte bridge in Germany

Last weekend the logistic experts of Wagenborg lowered two concrete girders from a height of 30 meters in Oldenburg. These girders are part of the old ‘Hunte bridge’ at the A29 motorway in Germany and had to be removed in the rebuilding project of this bridge.

Read more

17 April 2024 Again Wagenborg performs safe tug assistance for LNG carrier in Eemshaven

Sunday April 14th Wagenborg again assisted an inbound LNG carrier safely to berth in Eemshaven. For towing the SM Albatross, the Wagenborg tugs Waterlines, Waterland, Waterstraat and Waterstroom were put in action.

Read more

Contact us

We are happy to help!

Contact